DreamLine DL-6955C-01CL Guía de instalación

Busca en linea o descarga Guía de instalación para No DreamLine DL-6955C-01CL. DreamLine DL-6955C-01CL Installation Guide Manual de usuario

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 15
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 0
DUET
SHOWER DOOR INSTALLATION INSTRUCTIONS
IMPORTANT
DreamLine
TM
reserves the right to alter, modify or redesign products at any time
without prior notice. For the latest up-to-date technical drawings, manuals or any
other details please refer to the support.bathauthority.com
web page.
Please carefully read the instructions before installing. If you have any questions
regarding installation, please call our technical support specialists Monday through
Friday 9:00 AM – 5:00 PM EST at 1-866-731-8378, ext. 3 or e-mail our technical
support group at
For more information on DreamLine
TM
Shower Doors please visit www.BathAuthority.com
Rev 1.1 1
Vista de pagina 0
1 2 3 4 5 6 ... 14 15

Indice de contenidos

Pagina 1 - IMPORTANT

DUET SHOWER DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLineTM reserves the right to alter, modify or redesign products at any time without prior

Pagina 2 - Tools Required

9. One by one suspend both Glass doors onto the Upper guide rail as shown on Fig.13. Tilt the Glass door (A) a little to make the glass slide into t

Pagina 3 - Packing List

10. Slide both Glass Doors to the right. Insert the Left guide block (13) into the channel on the left side of the Guide rail and secure it using th

Pagina 4 - Shower Door Installation

12. Fasten the Rubber stopper (14) inside the groove of the Wall profile using the Round head screw ST4.2×16 (08). See Fig. 17 for details.

Pagina 5 - Rev 1.1 5

14. Apply the sealant along the profiles and guide rails; on the seams between the bottom guide rail and the profiles as well as along the shower ba

Pagina 6 - Fig. 5

© 2012 Bath Authority LLC.All Rights Reserved.DREAMLINE™ LIMITED WARRANTYThis is Bath Authority LLC’s (“DreamLine”) exclusive written warranty effecti

Pagina 7 - Fig. 8

TEL: 866-731-8378 – 215-957-1411 FAX: 866-227-9245 – 215-893-1780 WWW.BATHAUTHORITY.COM For more information on

Pagina 8 - Fig. 10

Preparation 1. After opening all boxes and packages, read this introduction carefully. Check that all of the needed parts are included in the packag

Pagina 9 - Fig. 12

Detailed Diagram of Shower Door Components 1234678910111213145 Packing List 01 Upper guide rail 1pc 08 Round head screw ST4.2×16 16pcs 02 Wa

Pagina 10 - Fig. 14

Shower Door Installation 1. Measure the distance between two walls. This distance is marked as “W”. See Fig. 1 for details. F

Pagina 11 - Fig. 16

3. Secure Upper guide rail (01) and Bottom guide rail (04) to the Glass profiles (03) with the Flat head screws ST4.2x25 (09). See Fig. 3 and Fig.

Pagina 12 - Fig. 18

4. Push the Wall profiles (02) all the way over the Glass profiles (03) at both sides. Make sure the flange of the wall profile faces inside the sho

Pagina 13 - Product Maintenance

5. Move the finished frame to the designated position and push it against the walls. If your top and bottom wall opening measurements are different

Pagina 14 - LIMITED WARRANTY

7. Apply silicone along the wall profile and around the holes on the wall. Also apply silicone under the bottom guide rail. Place the shower frame b

Pagina 15 - ATHAUTHORITY.COM

PLEASE NOTE: • On the outside Glass door (A) the Handle and the Rollers should face out. • On the inside Glass door (B) the Handle and the Rollers

Comentarios a estos manuales

Sin comentarios