Butterfly Shower Door, Base & Backwall Kit SHOWER Door, SHOWER BASE AND BACKWALLS KIT INSTALLATION INSTRUCTIONS IMPORTANT DreamLineTM reserv
Fig. 11 9. Secure the Roller stoppers (16) inside the top and the bottom Guide rails (03) with the Round head screw ST4.2×1
10. Install the Shower base according to the Shower base installation manual See Fig. 13 for details. Fig. 13 11. Locate the W
12. Push the Wall profiles (01) over the Glass profiles (02) on both sides. Be sure to keep the flange with predrilled holes inside the shower. See
14. Outline the Wall profiles (01) from inside of the Shower. Move the Glass unit aside. Remove the Wall profiles from the Glass unit and place them
16. Fold the Glass door, and adjust the bolts on the Rollers (12) to make the door slide smoothly. See fig. 19 for details. Fig.
18. Apply the silicone along the Wall profiles (01), as well as along the Guide rail (03). See Fig. 21 for details. NOTICE: Any adjustment to ma
Ver. 1, Rev. 1 QWALL – 5.1 (1 Back Panel) SHOWER ACRYLIC WALL INSTALLATION INSTRUCTIONS IMPORTANT DreamLineTM reserves the right to alter, modify o
Ver. 1, Rev. 1 2 Preparation 1. After opening all boxes and packages, read this introduction carefully. Check that all of the needed parts are inc
Ver. 1, Rev. 1 3Detailed Diagram of Acrylic Shower Wall Components 56784219334" - 38"30" - 34" Packing List 01 Side panel 2pc
Ver. 1, Rev. 1 4Preparation for Installation of Back Panel 1. Place a mark on the walls at a distance of 1” (one inch) from the corner and draw a p
BUTTERFLY SHOWER DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLineTM reserves the right to alter, modify or redesign products at any time with
Ver. 1, Rev. 1 5 3. The Back Panel (09) has 3-1/8” flange on both sides and has to be cut equally from both sides if necessary. See Fig. 3 for deta
Ver. 1, Rev. 1 6 5. Mark the measurement “W” on the Back Panel (09) and draw straight lines from top to bottom. NOTE: The Back Panel has to be trim
Ver. 1, Rev. 1 7 Fig. 7 Preparation for Installation of Side Panels ATTENTION: See Fig. 8 for details.
Ver. 1, Rev. 1 8 7. Measure the side walls of the shower from the 1” (one inch) line in the corner (from Step. 1) to the distance where you want Sid
Ver. 1, Rev. 1 9 9. Place the Side panel (01) on a flat piece of plywood or particle board. Use a sharp industrial knife and a T-square to score alon
Ver. 1, Rev. 1 10 10. Take exact measurements of the fixture on the wall: • from the 1” (one inch) line in the corner of the shower to the fixture:
Ver. 1, Rev. 1 11 12. Drill the holes for the fixtures in the Side panel (01) using the proper diameter saw bit or a handheld jig saw. See Fig. 15 f
Ver. 1, Rev. 1 12 Fig. 17 ATTENTION: 14. Apply the sealant to the entire surface of the reverse side of the Back panel
Ver. 1, Rev. 1 13 15. Attach the Back Panel (09) to the center of the back wall with the equal distance between two lines. See Fig. 19 for details.
Ver. 1, Rev. 1 14 17. Apply the sealant to the entire surface of the reverse side of the Side panel (01). Also, apply the sealant around the drilled h
Preparation 1. After opening all boxes and packages, read this introduction carefully. Check that all of the needed parts are included in the packa
Ver. 1, Rev. 1 15 19. Apply sealant to the entire surface of the reverse side of the other Side panel (01). See Fig. 21 for details. 20. Slide the
Ver. 1, Rev. 1 16 ATTENTION; Prior to the next step, please be sure the part of the wall for installation of the Decorative edge molding (03) is clea
Ver. 1, Rev. 1 17Glass Shelves Installation Instruction 24. Determine the desired height for the Glass shelves (05) and mark the locations on the wa
Ver. 1, Rev. 1 18 26. Mount the Shelf brackets (04) to the wall using the Countersunk screws ST4.2×30 (07). NOTE: the padded set screw of the Glass b
Ver. 1, Rev. 1 19 Product maintenance To insure long lasting life for your acrylic back walls, wipe them off after each use with a soft cloth. To
SLIMLINE SHOWER BASE SHOWER BASE DIMENSIONS AND INSTALLATION INSTRUCTIONS IMPORTANT DreamLineTM reserves the right to alter, modify or redesign
“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 2Preparation 1. Examine boxes and packages for shipping damage. Carefully remove Shower base from th
“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 3SINGLE THRESHOLD SHOWER BASE Center Drain Configuration MODEL SPECIFICATION D (in) W (in)
“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 4Left-Hand Drain Configuration MODEL SPECIFICAT
“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 5Right-Hand Drain Configuration
Detailed Diagram of Shower Door Components 1234567891011121314151617BA1812 Packing List 01 Wall profile 2pcs 10 Decorative cover 4pcs 02 Gla
“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 6NEO SHOWER BASE MODEL SPECIFICATION W (in) A (in) B (in) C (in) DLT-2
“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 7QUARTER ROUND SHOWER BASE MODEL SPECIFICATION W (in) C (
“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 8DOUBLE THRESHOLD SHOWER BASE Corner Drain Configuration MODEL SPECIFICATION W (in) C
“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 9Left-Hand Drain Configuration MODEL SPECIFICATION D (in) W (in) D1 (in) W1 (in)
“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 10Right-Hand Drain Configuration MODEL SPECIFICATION D (in) W (in) D1 (in)
“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 11Diagram of the Shower Base in a Cross Section Finished Wall Cement board S
“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 12Shower Base Installation Preparation 1. Ensure that the floor and the studs are at right angle. Pr
“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 132. Install the shower drain (NOT PROVIDED) according to the drain installation manual (supplied wit
“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 14 4. Level the tray and place marks on the studs above the upper edge of the tile flange. See
“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 15 6. After the bedding material has been poured and before it sets, place the shower base into the p
Shower Door Assembly NOTICE: The installation presented here is for the left door opening. For the right door opening, you will need to rotate the
“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 16 Fig. 9 Product maintenance To insure long lasting life
DREAMLINE™EXCLUSIVELIMITEDWARRANTYASOFMAY6,2013Thiswarrantyextendsonlytotheoriginalowner/end‐userforhouseholduseonlyandisnottr
TEL: 866-731-2244 FAX: 866-227-1533 WWW.BATHAUTHORITY.COM For more information on DreamLineTM Shower Doors please visit www.Bath
B3. Attach the top and the bottom Rollers (12) to the right edge of the Glass Door B (05). Mind the position of the rollers on the glass. See Fig.
Fig. 5 5. Locate the Guide rails (03) and the Glass profile (02). Connect the left end of the Guide rails to the Glass pro
6. Slide the glass unit into the channel of the Guide rails (03) from the right side. See Fig. 7 and Fig. 8 for details. F
7. Secure the Hinges (13) inside the Guide rails (03) using the Round head screws ST4.2×12 (08). See Fig. 9 for details. Fig.
Comentarios a estos manuales