DreamLine DL-6205R-04CL Guía de instalación Pagina 1

Busca en linea o descarga Guía de instalación para Conectores de cable DreamLine DL-6205R-04CL. DreamLine DL-6205R-04CL Installation Guide Manual de usuario

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 52
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 0
Elegance Shower Door & Base Kit
S
HOWER
Door
AND
S
HOWER
B
ASE
KIT I
NSTALLATION
I
NSTRUCTIONS
IMPORTANT
DreamLine
TM
reserves the right to alter, modify or redesign products at any time
without prior notice. For the latest up-to-date technical drawings, manuals or any
other details please refer to the support.BathAuthority.com
web page.
STEP 1: Install Shower Base
Shower Base Installation Instructions
STEP 2: Install Shower Door
Shower Door Installation Instructions
Please read these instructions carefully before installing. If you have any questions regarding
installation, please call our technical support specialists Monday through Friday 9:00 AM 5:00
PM EST at Phone:
1-866-731-2244, Fax: 1-866-227-1533 or e-mail our technical support
group at
support@BathAuthority.com.
For more information on DreamLine Shower Kit please visit www.BathAuthority.com
Vista de pagina 0
1 2 3 4 5 6 ... 51 52

Indice de contenidos

Pagina 1 - NSTRUCTIONS

Elegance Shower Door & Base Kit SHOWER Door AND SHOWER BASE KIT INSTALLATION INSTRUCTIONS IMPORTANT DreamLineTM reserves the right to alter,

Pagina 2 - ELEGANCE

“Elegance” Rev.4 Ver.1 07/2013 9 NOTICE: The Glass door has 2 cuts for the Pivot assemblies. The deeper cut must be on the top. 6. Remove the Bolts

Pagina 3 - Preparation

“Elegance” Rev.4 Ver.1 07/2013 10 8. Open the Glass door (03). See Fig. 8 for details. Fig. 8 9. Close the hole in the

Pagina 4 - Diagram C

“Elegance” Rev.4 Ver.1 07/2013 11 10. Push the Anti-water strip (10) into the vertical groove of the Glass profile for glass door (02). Attach the Bot

Pagina 5

“Elegance” Rev.4 Ver.1 07/2013 12 ATTENTION: Steps 11-16 Follow these steps if the width of your door is less than 37¾” and you are installing the do

Pagina 6

“Elegance” Rev.4 Ver.1 07/2013 13 12. Use a level to ensure that the Glass door (03) and the Wall profile (05) is absolutely vertical. Draw a line alo

Pagina 7 - Fig. 1

“Elegance” Rev.4 Ver.1 07/2013 14 14. Adjust the width of the Glass door (03) by pulling out the Glass profiles (02) and (04) if it necessary for size

Pagina 8

“Elegance” Rev.4 Ver.1 07/2013 15 16. Apply silicone sealant between the tray or threshold and the pivot bracket. Also, apply silicone between the wa

Pagina 9

“Elegance” Rev.4 Ver.1 07/2013 16Style “B”: Stationary Glass Assembly and Installation NOTE: Use parts from Diagram “B” and “C” for the Stationar

Pagina 10 - Fig. 7

“Elegance” Rev.4 Ver.1 07/2013 17 19. Draw a line along the inner edge of the Wall profile (05) on the wall. Detach the Wall profile from the Stationa

Pagina 11 - Fig. 9

“Elegance” Rev.4 Ver.1 07/2013 18 21. Adjust the Stationary glass (21) position to ensure that when the Glass door (03) is closed, there is a gap (1/1

Pagina 12

MODEL: __________ STYLE: __________ SELECTOR: __________ Please choose your door model, style and selector according to your order for e

Pagina 13 - ATTENTION:

“Elegance” Rev.4 Ver.1 07/2013 19 23. Apply silicone sealant between the tray or threshold and the pivot bracket. Also, apply silicone between the wal

Pagina 14

“Elegance” Rev.4 Ver.1 07/2013 20Style “B” and “D”: Stationary Glass Assembly and Installation NOTE: Use parts from Diagram “B” or “C” (depends on y

Pagina 15

“Elegance” Rev.4 Ver.1 07/2013 21Style “C” and “D”: Shower Enclosure Assembly and Installation NOTE: Use parts from Diagram “A” and Diagram “B” or “

Pagina 16

“Elegance” Rev.4 Ver.1 07/2013 22 26. Apply clear silicone along the inner channel of the Glass profile (04) and push the Stationary glass (21) insid

Pagina 17

“Elegance” Rev.4 Ver.1 07/2013 23 28. Push the Pivot retainers (08) into both ends of the Wall profile for glass door (01). See fig. 30

Pagina 18

“Elegance” Rev.4 Ver.1 07/2013 24

Pagina 19

“Elegance” Rev.4 Ver.1 07/2013 25NOTICE: The Glass door has 2 cuts for the Pivot assemblies. The deeper cut must be on the top. 32. Remove the Bolts

Pagina 20

“Elegance” Rev.4 Ver.1 07/2013 26 34. Press the Anti-water strip (29) onto the vertical edge of the Stationary glass (21). Carefully butt the Stationa

Pagina 21 - Glass shelves installation

“Elegance” Rev.4 Ver.1 07/2013 27

Pagina 22

“Elegance” Rev.4 Ver.1 07/2013 28 37. Adjust the width of the opening section of the Glass door (03) by loosen the holding screws on the Pivot assemb

Pagina 23

“Elegance” Rev.4 Ver.1 07/2013 2 Preparation 1. After opening all boxes and packages, read this introduction carefully. Check that all of the need

Pagina 24

“Elegance” Rev.4 Ver.1 07/2013 29 39. Do the final adjustment if necessary. Make sure the Glass door (03) closes tight to the Anti-Water strip (29).

Pagina 25

“Elegance” Rev.4 Ver.1 07/2013 30 41. Apply silicone sealant between the tray or threshold, the stationary glass and the accessory. Also, apply silico

Pagina 26

“Elegance” Rev.4 Ver.1 07/2013 31 Style “C”: Support Bar Assembly and Installation NOTE: Use parts from Diagram “C” for the Support Bar assembly a

Pagina 27

“Elegance” Rev.4 Ver.1 07/2013 32 Style “D”: Glass Shelves Assembly and Installation NOTE: Use parts from Diagram “B” for the Glass Shelves assemb

Pagina 28

“Elegance” Rev.4 Ver.1 07/2013 33 Maintenance To insure long lasting life for your acrylic back walls, wipe them off after each use with a soft cl

Pagina 29

SLIMLINE SHOWER BASE SHOWER BASE DIMENSIONS AND INSTALLATION INSTRUCTIONS IMPORTANT DreamLineTM reserves the right to alter, modify or redesign

Pagina 30

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 2Preparation 1. Examine boxes and packages for shipping damage. Carefully remove Shower base from th

Pagina 31

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 3SINGLE THRESHOLD SHOWER BASE Center Drain Configuration MODEL SPECIFICATION D (in) W (in)

Pagina 32

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 4Left-Hand Drain Configuration MODEL SPECIFICAT

Pagina 33

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 5Right-Hand Drain Configuration

Pagina 34 - Maintenance

“Elegance” Rev.4 Ver.1 07/2013 3Detailed Diagrams of Shower Door Components Diagram A

Pagina 35 - SLIMLINE SHOWER BASE

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 6NEO SHOWER BASE MODEL SPECIFICATION W (in) A (in) B (in) C (in) DLT-2

Pagina 36

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 7QUARTER ROUND SHOWER BASE MODEL SPECIFICATION W (in) C (

Pagina 37 - SINGLE THRESHOLD SHOWER BASE

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 8DOUBLE THRESHOLD SHOWER BASE Corner Drain Configuration MODEL SPECIFICATION W (in) C

Pagina 38

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 9Left-Hand Drain Configuration MODEL SPECIFICATION D (in) W (in) D1 (in) W1 (in)

Pagina 39

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 10Right-Hand Drain Configuration MODEL SPECIFICATION D (in) W (in) D1 (in)

Pagina 40 - NEO SHOWER BASE

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 11Diagram of the Shower Base in a Cross Section Finished Wall Cement board S

Pagina 41 - QUARTER ROUND SHOWER BASE

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 12Shower Base Installation Preparation 1. Ensure that the floor and the studs are at right angle. Pr

Pagina 42 - DOUBLE THRESHOLD SHOWER BASE

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 132. Install the shower drain (NOT PROVIDED) according to the drain installation manual (supplied wit

Pagina 43

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 14 4. Level the tray and place marks on the studs above the upper edge of the tile flange. See

Pagina 44

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 15 6. After the bedding material has been poured and before it sets, place the shower base into the p

Pagina 45

“Elegance” Rev.4 Ver.1 07/2013 4 NOTE: Unpack your unit carefully and inspect it. Lay it out and identify all parts using the detailed diagram and p

Pagina 46

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 16 Fig. 9 Product maintenance To insure long lasting life

Pagina 47

DREAMLINE™EXCLUSIVELIMITEDWARRANTYASOFMAY6,2013Thiswarrantyextendsonlytotheoriginalowner/end‐userforhouseholduseonlyandisnottr

Pagina 48

TEL: 866-731-2244 FAX: 866-227-1533 WWW.BATHAUTHORITY.COM For more information on DreamLineTM Shower Doors please visit www.Bath

Pagina 49

“Elegance” Rev.4 Ver.1 07/2013 5 Self Closing Pivot Assembly Parts List A Flat head bolt M4×8 1pc G Bolt M12×10 1pc B Pivot bracket 1pc H

Pagina 50 - Product maintenance

“Elegance” Rev.4 Ver.1 07/2013 6Style “A”: Single Shower Door Assembly and Installation NOTE: Use parts from Diagram “A” for the Single Shower doo

Pagina 51 - WARRANTYSERVICE

“Elegance” Rev.4 Ver.1 07/2013 7 2. Push the Pivot retainers (08) into both ends of the Wall profile for glass door (01). See Fig. 2 for details.

Pagina 52 - BATHAUTHORITY.COM

“Elegance” Rev.4 Ver.1 07/2013 8 4. Attach the Pivot assembly (07) to the top and the bottom ends of the Glass profile for glass door (02) with the F

Comentarios a estos manuales

Sin comentarios