DreamLine DL-6112R-04CL Guía de instalación

Busca en linea o descarga Guía de instalación para No DreamLine DL-6112R-04CL. DreamLine DL-6112R-04CL Installation Guide Manual de usuario

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 13
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 0
Rev 1.6
1
VISION
SHOWER DOOR & TUB DOOR INSTALLATION INSTRUCTIONS
IMPORTANT
DreamLine
TM
reserves the right to alter, modify or redesign products at any time without
prior notice. For the latest up-to-date technical drawings, manuals or any other details
please refer to the support.BathAuthority.com
web page.
Please carefully read the instructions before installing. If you have any questions
regarding installation, please call our technical support specialists Monday through Friday
9:00 AM – 5:00 PM EST at 1-866-731-8378, ext. 3 or e-mail our technical support group at
support@BathAuthority.com.
For more information on DreamLine
TM
Shower Doors & Tub Doors please visit www.BathAuthority.com
Vista de pagina 0
1 2 3 4 5 6 ... 12 13

Indice de contenidos

Pagina 1 - IMPORTANT

Rev 1.6 1 VISION SHOWER DOOR & TUB DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLineTM reserves the right to alter, modify or redesign products

Pagina 2 - Tools Required

Rev 1.6 10 14. Install the Handles (06) to the Glass doors (04). Press the anti-water strips (08) on the vertical edges of the Stationary glasses (05

Pagina 3 - Packing List

Rev 1.6 11 16. Apply the sealant along the profiles and guide rails; on the seams between the bottom guide rail and the profiles as well as along the

Pagina 4 - Shower Door Installation

© 2012 Bath Authority LLC.All Rights Reserved.DREAMLINE™ LIMITED WARRANTYThis is Bath Authority LLC’s (“DreamLine”) exclusive written warranty effecti

Pagina 5 - Fig. 3

Rev 1.6 13 TEL: 866-731-8378 – 215-957-1411 FAX: 866-227-9245 – 215-893-1780 WWW.BATHAUTHORITY.COM For more infor

Pagina 6

Rev 1.6 2Preparation 1. After opening all boxes and packages, read this introduction carefully. Check that all of the needed parts are included in t

Pagina 7 - Fig. 8

Rev 1.6 3Detailed Diagram of Shower Door Components 1234568910111213141516177 Packing List 01 Glass profile 2pcs 10 Round head screw ST4.2×30

Pagina 8

Rev 1.6 4Shower Door Installation 1. Measure the distance between two walls. This distance is marked as “W”. See Fig. 1 for details.

Pagina 9

Rev 1.6 5 Fig. 3 3. If the Guide rails (03) have been cut, you will need to reinstall the roller stoppers on each Guide rail

Pagina 10 - Rev 1.6

Rev 1.6 6 4. Fasten the bottom Guide rail (03) to the Glass profiles (01) with the Round head screws ST4.2x25 (11). See Fig. 5 for details.

Pagina 11 - Product Maintenance

Rev 1.6 7 6. Slightly tap the Single side strips (09) in between the Stationary glasses (05) and the Glass profiles (01) using wooden shim or other p

Pagina 12 - LIMITED WARRANTY

Rev 1.6 8 9. Move the finished frame to the designated position on the shower base, the bathtub or the threshold (depending on your installation); pu

Pagina 13 - BATHAUTHORITY.COM

Rev 1.6 9 NOTE: Glass Door (04) comes with preinstalled Wheel assemblies (17). If not, please refer to (Fig. 11) for detailed installation. 12. Faste

Comentarios a estos manuales

Sin comentarios